top of page

CASE STUDY

11 Woodside

DUNSTABLE
JLL-Logo-Grey.png

Warehouse and Office Refurb, Dunstable.

An extensive refurbishment and remodelling of an existing industrial warehouse and office facility, delivering upgraded loading provision, expanded yard space and a contemporary CAT B office fit-out to create a modern, market-ready asset.

Unit 11 woodside 00026.JPG

PROJECT LOCATION

Dunstable

CONSULTANCY

JLL

PROGRAMME

7 months

SECTOR

Industrial | Office

SCOPE OF WORKS

​

The project involved the extensive refurbishment and remodelling of an existing industrial warehouse and office facility, transforming the asset into a modern, market-ready unit for future occupiers.

​

Works included the demolition and reduction of existing façades to increase the external yard area and improve access for larger vehicles, alongside significant structural steel alterations and the formation of new loading bays.

Five new dock leveller bays were installed, together with new sectional loading doors, external fire exits and upgraded warehouse lighting, power and fire alarm systems.

​

Internally, the office accommodation received a full CAT B fit-out, creating contemporary breakout areas, meeting rooms and a boardroom. Existing welfare facilities were also refurbished, including the kitchen, canteen and locker rooms.

​

Externally, new cladding was installed throughout, complemented by a bespoke timber-effect frontage to the office areas. Secure fencing, access gates and a green-roof cycle shelter completed the scheme.

​​

unit 11 woodside.png

About

PROJECT DELIVERY

The scale of the refurbishment required careful coordination across demolition, groundworks, structural steelwork, fit-out and M&E packages.

​

Significant alterations to both the building and external areas were carefully sequenced to ensure each stage of the programme could progress safely and efficiently, while maintaining quality and budget requirements throughout.

​

Particular attention was also given to the internal finishes, with a bold colour palette and contemporary design creating a workspace that feels modern, welcoming and distinct from a traditional industrial environment.

PROJECT OUTCOME

The completed scheme has transformed the existing asset into a high-quality, futureproofed industrial and office facility ready for its next occupier.

​

Improved vehicle access, expanded loading provision and upgraded warehouse infrastructure have enhanced the operational capabilities of the unit, while the CAT B office fit-out and refurbished welfare spaces provide a modern working environment for future teams.

​

The result is a significantly upgraded, market-ready facility designed to maximise the long-term value and appeal of the asset.

COMMERCIAL OFFICE Unit 11 woodside 00176.JPG

Contact

Project Contact

Rob Carter.jpg
  • LinkedIn

Rob Carter

Regional Director, Stevenage

Logo-saved-from-site.png
  • LinkedIn
  • Instagram
  • Facebook
  • YouTube
  • TikTok

CANNOCK OFFICE  |   HQ

MIDLANDS

Crestwood House The Green, Hawks Green Lane, Cannock, WS11 7LG

STEVENAGE OFFICE

SOUTH

First Floor, 5 Viewpoint Office Village, Stevenage, Hertfordshire, SG1 2EQ

GLASGOW OFFICE

SCOTLAND

Suite F03, New Alderston House, 3 Dove Wynd, Strathclyde Business Park, Bellshill, ML4 3FB

WARRINGTON OFFICE

NORTH

Orchard Court, Knutsford Road, Warrington, CW9 6JW

CARDIFF OFFICE

WALES + WEST

Suite 6D, Quest House, St Mellons Business Park Fortran Road, Cardiff, CF3 0EY

© 2026 Inco Contracts. All rights reserved. Website by ThinkEngine.

bottom of page